A professional manufacturer of C-type iron core and transformer

In line with the standard of Ministry of Industry

Lu Dongliang

+86-13806175835


NEWS CENTER

Transformer no-load short-circuit tester use precautions

release time:2019-10-18

Before the transformer is delivered and during the overhaul period, the no-load and load test of the transformer is an important experimental project for the transformer manufacturer and the power supply and power supply departments to detect the transformer quality and reduce the power supply loss. According to the actual needs of the customer and the on-site experimental conditions, the GD-type transformer loss parameter tester independently developed by our company, the transformer no-load short-circuit tester has accurate and reliable test data, intuitive human-machine interface dialogue, easy operation and convenient carrying. It is an updated product of transformer characteristic test, and it is an ideal testing equipment for power sector and transformer manufacturers.      Transformer no-load short-circuit tester use precautions      1. Read the instructions carefully before using the instrument.      2. The instrument should be used by professional laboratory personnel.      3. Wire the wiring according to the nameplate wiring diagram.      4. According to the transformer parameters, the rated capacity, primary voltage and secondary voltage are correctly input. When an external CT or PT is required, its value corresponds to the CT and PT items of the input main menu.